
01 — KOKAMDO · Office interiors & workplace strategy · since 1991
An office move is not
a construction job.
It is a business decision.
02 — Our approach
Not one manager's hunch. We plan space from data on your whole team.
We start by reading headcount and the way people work, then set the area and layout. That gives every square meter a reason, lowers the anxiety during construction, and keeps the same team with you after move-in. We have worked this way since 1991.
Sample assessment — Head office · 6 floors above ground, 2 below · 170 staff
Two pages from a real report · client name withheld
- Survey
- 45 questions · 97 responses of 170 staff
- Interviews
- Group interviews by department · work patterns and pain points
- Site survey
- 2 days · how each space is used, B2F to 6F
- 01
Focus — meeting rooms
Meeting rooms are open and too few for focused meetings. Floors 2 to 4 have none.
Guide: Department meeting rooms on 2F–6F, a shared large room on 1F
- 02
Order — storage
Storage sits on B2F, so boxes pile up in the work areas on every floor.
Guide: Department storage and cabinets on each floor; B2F becomes department storage
- 03
Rest — support spaces
The only break area is on 6F. It is out of the way and crosses visitor traffic.
Guide: A pantry and phone booths on each floor, a work lounge on 1F
Before — no meeting rooms or support spaces on 2F–4F, one break area on 6F, storage piled on B2F
- Inno-Biz certification2007 · technology innovation
- Women-owned business2009
- Interior construction license2000
- Corporate Environment Design Instituteest. 2005
- Korea Design Firms Association2010 · member

03 — Schools and public-sector projects
The school stays open.
The work does not stop.
For schools and public buildings we look at function, safety, schedule and administrative requirements together. We have built in schools during classes and in agencies during working hours.
Public-sector cases (Korean)04 — What we do
One team does all four, in sequence. Nobody has to translate between a design firm and a contractor.
AssessmentSpace planningDesignConstructionHandover & aftercare
05 — Cases
All 39 cases (Korean)CSK/EDWARD KOREA 천안 C4 신사옥 · Industrial · 9,917 m² · 천안 아산
CSK/EDWARD KOREA 천안 C4 신사옥 · Industrial · 9,917 m² · 천안 아산
06 — Start