PNE SYSTEMS featured image

01 — KOKAMDO · Office interiors & workplace strategy · since 1991

An office move is not
a construction job.
It is a business decision.

PNE SYSTEMS

02 — Our approach

Not one manager's hunch. We plan space from data on your whole team.

We start by reading headcount and the way people work, then set the area and layout. That gives every square meter a reason, lowers the anxiety during construction, and keeps the same team with you after move-in. We have worked this way since 1991.

Sample assessment — Head office · 6 floors above ground, 2 below · 170 staff

Two pages from a real report · client name withheld

Workplace assessment report02 — Survey and findings
Survey
45 questions · 97 responses of 170 staff
Interviews
Group interviews by department · work patterns and pain points
Site survey
2 days · how each space is used, B2F to 6F
  1. 01

    Focus — meeting rooms

    Meeting rooms are open and too few for focused meetings. Floors 2 to 4 have none.

    Guide: Department meeting rooms on 2F–6F, a shared large room on 1F

  2. 02

    Order — storage

    Storage sits on B2F, so boxes pile up in the work areas on every floor.

    Guide: Department storage and cabinets on each floor; B2F becomes department storage

  3. 03

    Rest — support spaces

    The only break area is on 6F. It is out of the way and crosses visitor traffic.

    Guide: A pantry and phone booths on each floor, a work lounge on 1F

KOKAMDO 고감도Head office · client name withheld
Workplace assessment report03 — Floor zoning · before and after

Before — no meeting rooms or support spaces on 2F–4F, one break area on 6F, storage piled on B2F

KOKAMDO 고감도6F – B2F · 2F–6F staff · 1F visitors
In business36 yearsFounded in 1991
Industries9Semiconductors & precision equipment · IT & software · Batteries & manufacturing · Games & content · Schools & education · Government & courts · Healthcare · F&B & retail · Culture & exhibitions
Published cases80Projects on the cases page (Korean)
Registrations & memberships
  • Interior construction license2000
  • Corporate Environment Design Instituteest. 2005
  • Korea Design Firms Association2010 · member
Eonnam Elementary School library, built by KOKAMDO

03 — Schools and public-sector projects

The school stays open.
The work does not stop.

For schools and public buildings we look at function, safety, schedule and administrative requirements together. We have built in schools during classes and in agencies during working hours.

Public-sector cases (Korean)

04 — What we do

One team does all four, in sequence. Nobody has to translate between a design firm and a contractor.

AssessmentSpace planningDesignConstructionHandover & aftercare

05 — Before you sign

Three things to settle
before you sign a lease.

  1. 01

    Area before the lease

    Listings often show the contract area, which includes common areas. We first check the area you need against your headcount, seating style and the listing's efficiency ratio.

  2. 02

    Move-in schedule and scope

    We plan design and construction backwards from your move-in date, and split what can be done while you keep using your current office from what waits until after the move.

  3. 03

    What the budget includes

    We separate construction items from those budgeted separately, such as furniture, IT and moving, so quotes can be compared on the same basis.

07 — Start

Start with the area
you actually need.

Anonymous · 3 minutes · area analysis · no contact detailsTalk to us afterwards only if you want